ArcGIS REST Services Directory Login
JSON

ItemInfo

Item Information

snippet: Significant projects are all Interstate System projects within the boundaries of a designated Transportation Management Area (TMA) that occupy a location for more than three days with either intermittent or continuous lane closures. This layer maps out where they are located.
summary: Significant projects are all Interstate System projects within the boundaries of a designated Transportation Management Area (TMA) that occupy a location for more than three days with either intermittent or continuous lane closures. This layer maps out where they are located.
extent: [[-97.5370251090482,37.4227882331985],[-94.5953047782911,39.2408239046258]]
accessInformation: Kansas Department of Transportation (KDOT)
thumbnail: thumbnail/thumbnail.png
maxScale: 1.7976931348623157E308
typeKeywords: ["Data","Service","Map Service","ArcGIS Server"]
description: <DIV STYLE="text-align:Left;font-size:12pt"><DIV><DIV><P><SPAN>All Interstate System projects within the boundaries of a designated Transportation Management Area (TMA) that occupy a location for more than three days with either intermittent or continuous lane closures shall be defined as significant projects.</SPAN></P><P><SPAN /></P><P><SPAN>Also, projects that meet all of the following criteria will also be defined as Significant:</SPAN></P><P><SPAN /></P><P><SPAN>Located in a metro area with a population greater than 50,000 or in a Metropolitan Planning Organization (MPO).</SPAN></P><P><SPAN>AADT greater than 30,000 vpd. Or AADT greater than 10,000 vpd with 30% truck (HC)</SPAN></P><P><SPAN>Class A or B State System routes Or urban principal arterials.</SPAN></P><P><SPAN>Long anticipated duration: traffic impacts equal to or greater than 60 days. Note: maintenance operations with moving work zones (such as pavement patching or overlays) are not considered significant since the duration at a specific site will be less than 60 days.</SPAN></P><P><SPAN>Traffic delays or detours that result in greater than 30 minutes of additional delay. (this was established in the Kansas Work Zone Safety and Mobility Processes and Procedures document).</SPAN></P></DIV></DIV></DIV>
licenseInfo: <DIV STYLE="text-align:Left;font-size:12pt"><P><SPAN>KDOT makes no warranties, guarantees, or representations for accuracy of this information and assumes no liability for errors or omissions.</SPAN></P></DIV>
catalogPath:
title: SigWorkZone
type: Map Service
url:
tags: ["Significant Work Zone","Transportation Management Area","TMA","KDOT","AADT","Traffic","Detours","Maintenance","MPO","Metropolitan Planning Organization","Projects","Interstate"]
culture: en-US
name: SigWorkZone
guid: 9A917578-237A-40B5-BE9D-36DD2B391CF2
minScale: 0
spatialReference: NAD_1983_Kansas_LCC_ftUS